1.

Munda Dam is an under-construction dam located on the ..... River which will generate 740 MW of Hydroelelctricity in 2017.

Gomal

2.

The 4320 MW Dasu Hydro Project is one of the cascade of water resouces development projects conceived on .... river.

Indus River

3.

Bunji Hydropower project would be the largest Hydro power project of Pakistan with an installed capacity of ..... MW.

7100 MW

4.

What will be the installed power generation capacity of Tarbela 4th Extention?

1410 MW

5.

What will be the installed power generation capacity of Neelum Jhelum Hydroelectric Project which is located in th vacinity Muzaffarabad (AJ&K) and will be completed in November 2016?

969 MW

6.

What is the producing capacity of electricity of Ghazi Barotha dam?

1450 MW

7.

Name the largest hydel powerstation among, Warsak, Dargai, Nandipur and Tarbela.

Tarbela

8.

Water is the cause of waterlogging and sanlinity problem in Pakistan?

Uncontrolled seepage of water from rivers, canals, ponds, etc that rises underground water table.

9.

Pakistan-Tukmenitan gas pipeline project will be sponsored by....

Asian Development Bank

10.

Pakistan protested against India's construction of Baglihar Dam on Chenab river because....

It is violation of Indus Basin Treaty 1960

11.

Wapda will construct Hingol Dam on river Hingol in...

Balochistan

12.

The Basha Dam on Indus River is being constructed in....

Northern Areas